High Performance C10 Circuit Breaker - DAB6 MCB – DaDa
- Contact Us
- Address: Shanghai DaDa Electric Co.,Ltd.
- Phone: 0086-15167477792
- Email: charlotte.weng@cdada.com
High Performance C10 Circuit Breaker - DAB6 MCB – DaDa Detail:
Normal operating conditions and installation conditions
Ambient air temperature: -5℃~40℃, and average temperature in 24h below +35℃.
Altitude of the installation site should not exceed 2000m.
Atmospheric relative humidity at ambient air temperature is + 40℃ for not more than 50%, in the low temperature can have higher relative humidity. For example, in +20℃ , the relative humidity can reach 90%.
It should be noted that, due to temperature changes, for appropriate condensation produced occasionally, appropriate measures should be taken (such as drainage holes).
The installation adopts vertical installation. The inclination of the mounting plane to the vertical plane should not exceed ± 5 °
The place without significant shake and shock vibration.
If installed in a closed protective case, and more than one are installed closely, which should be used after the derating, derating factor optional 0.7 ~ 0.8, use high-value for metal protective case, for plastic protective case, you can use low value .
Product detail pictures:
Related Product Guide:
To be a result of ours specialty and service consciousness, our enterprise has won an excellent status between buyers all around the globe for High Performance C10 Circuit Breaker - DAB6 MCB – DaDa , The product will supply to all over the world, such as: European, New Orleans, Plymouth, Due to the stability of our products, timely supply and our sincere service, we are able to sell our products not only over the domestic market, but also exported to countries and regions, including the Middle East, Asia, Europe and other countries and regions. At the same time, we also undertake OEM and ODM orders. We will do our best to serve your company, and establish a successful and friendly cooperation with you.
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
